1. PURPOSE
It is established to provide a proper procedure for batch processing (manufacturing) in different department of production.
2. SCOPE
It is applicable in Injectable departments of production.
3. RESPONSIBILITY
Maintenance officer (Mechanical / Electrical)
Maintenance Supervisor (Mechanical / Electrical)
4. PROCEDURE
The S.S. Pressure Vessel with instrument is handled in the following way.
5. MAINTENANCE
MONITORING OF MACHINE MAINTENANCE:
Time to time check each and every part of S.S. Pressure Vessel according to the maintenance schedule.
Check the following parts carefully.
Electric motor & stirrer
Electric Starter
Valve & joints
Mechanical Seal
Rubber Seal for joint
This activity is then documented in the form Machinery & Equipment Maintenance Log
Check the Pressure Vessel condition time to time to find any kind of problem during operation.
All the monitoring record is filed and kept by the Maintenance Supervisor.
EMERGENCY / BREAKDOWN MONITORING:
Maintenance Manager receives Maintenance Work Order duly signed by the section incharge of the concerned machinery or equipment.
Maintenance Work Order is assigned a number according to the receiving in the Maintenance Reference Register.
Maintenance Manager assigns the maintenance work to the concerned personal
After the completion of work the section incharge signs the completion of Work Order.
All the record is filed and kept by the Maintenance Supervisor.
PRECAUTIONS:
Before going to operation check each and every thing to meet any kind of emergency.
Always appoint trained staff on the plant.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment