1. PURPOSE
It is established to provide a proper procedure for transmission of thick liquids.
2. SCOPE
It is applicable in Liquid manufacturing department.
3. RESPONSIBILITY
Maintenance officer (Mechanical / Electrical)
Maintenance Supervisor (Mechanical / Electrical)
4. PROCEDURE
The Gear Pump with instrument is handled in the following way.
5. MAINTENANCE
MONITORING OF MACHINE MAINTENANCE:
Time to time check each and every part of Gear Pump according to the maintenance schedule.
Check the following parts carefully.
Electric Supply
Electric Motor
Gear
V. Belt
Gear Pump
Bearings
Oil Level (If Required Change It)
This activity is then documented in the form Machinery & Equipment Maintenance Log
Check the Gear Pump condition time to time to find any kind of problem during operation.
All the monitoring record is filed and kept by the Maintenance Supervisor.
EMERGENCY / BREAKDOWN MONITORING:
Maintenance Manager receives Maintenance Work Order duly signed by the section incharge of the concerned machinery or equipment.
Maintenance Work Order is assigned a number according to the receiving in the Maintenance Reference Register.
Maintenance Manager assigns the maintenance work to the concerned personal
After the completion of work the section incharge signs the completion of Work Order.
All the record is filed and kept by the Maintenance Supervisor.
PRECAUTION:
Immediately stop the machine whenever feel any kind of abnormality during operations.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment