1. PURPOSE
1. It is established to provide a proper procedure for the transmission of water/solution
in different production departments.
2. SCOPE
2. It is applicable in different production departments.
3. RESPONSIBILITY
1. Maintenance officer (Mechanical / Electrical)
2. Maintenance Supervisor (Mechanical / Electrical)
4. PROCEDURE
The Pump with instrument is handled in the following way.
MONITORING OF MACHINE MAINTENANCE:
Time to time check each and every part of Pump according to the maintenance schedule. Check the following parts carefully.
Electric motor
Electric Starter
Mechanical Seal
Pump Impeller
Pump Pressure
This activity is then documented in the form Machinery & Equipment Maintenance Log Check the Pump condition time to time to find any kind of problem during operation.
All the monitoring record is filed and kept by the Maintenance Supervisor.
EMERGENCY / BREAKDOWN MONITORING:
Maintenance Manager receives Maintenance Work Order duly signed by the section incharge of the concerned machinery or equipment.
Maintenance Work Order is assigned a number according to the receiving in the Maintenance Reference Register.
Maintenance Manager assigns the maintenance work to the concerned personal
After the completion of work the section incharge signs the completion of Work Order.
All the record is filed and kept by the Maintenance Supervisor.
PRECAUTIONS:
Do not operate the pump when the valve is in closed position.
Switch to “OFF” the pump if find any kind of abnormality during operations.