1. PURPOSE
It is established to provide a proper procedure for uniform spraying of solution.
2. SCOPE
It is applicable in Dry Product manufacturing section.
3. RESPONSIBILITY
Maintenance officer (Mechanical )
Maintenance Supervisor (Mechanical)
4. PROCEDURE
The Coating Pan with instrument is handled in the following way.
5. MAINTENANCE
MONITORING OF MACHINE MAINTENANCE:
Time to time check each and every part of Spray Gun according to the maintenance schedule.
Check the following parts carefully.
Spray Gum Functioning
Air Pressure Flow
Pipe Line Functioning
This activity is then documented in the form Machinery & Equipment Maintenance Log Check the Spray Gun condition time to time to find any kind of problem during operation.
All the monitoring record is filed and kept by the Maintenance Supervisor.
EMERGENCY / BREAKDOWN MONITORING:
Maintenance Manager receives Maintenance Work Order duly signed by the section incharge of the concerned machinery or equipment.
Maintenance Work Order is assigned a number according to the receiving in the Maintenance Reference Register.
Maintenance Manager assigns the maintenance work to the concerned personal
After the completion of work the section incharge signs the completion of Work Order.
All the record is filed and kept by the Maintenance Supervisor.
PRECAUTION:
Always handle the spray gun carefully and store it in a safe place away from dust and moisture.