1. PURPOSE
To provide a procedure for calibration of Manometer.
2. SCOPE
This procedure covers all Manometers being calibrated.
3. RESPONSIBILITY
Calibration Incharge
Maintenance Manager
4 PROCEDURE
Manometer is calibrated as follows
First of all check the Manometer level.
Open the door of the concerned room and adjust the knob at ZERO.
Adjust zero error if applicable, check level of Manometer adjust it if required
The Manometers are checked during whole span of working.
Calibration incharge prepares the calibration report and submit to the Manager maintenance.
The calibration report is sign by concern calibration incharge and then by Manager
Maintenance.
FREQUENCY
Manometer is calibrated every month
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment