Thursday, July 16, 2009

AIR BLOWER

1.0 PURPOSE

It is established to provide a proper procedure for blowing of bottles in Oral Liquid & Dry Powder

2.0 SCOPE

It is applicable in Oral Liquid & Dry Powder section.

3.0 RESPONSIBILITY

Maintenance officer (Mechanical / Electrical)
Maintenance Supervisor (Mechanical / Electrical)

4.0 PROCEDURE

The Air Blower with instrument is handled in the following way.

5.0 MAINTENANCE

MONITORING OF MACHINE MAINTENANCE:

Time to time check each and every part of Air Blower Plant according to the maintenance schedule. (Ref. SIZA/GSOP/MN/001)
Check the following parts carefully.
vElectric Switch
vElectric Motor
vBearings
vBlower & seal
This activity is then documented in the form Machinery & Equipment Maintenance Log
Check the Air Blower Plant condition time to time to find any kind of problem during operation.
All the monitoring record is filed and kept by the Maintenance Supervisor.

5.2 EMERGENCY / BREAKDOWN MONITORING:

Maintenance Manager receives Maintenance Work Order (QR/ME/011/01) duly signed by the section incharge of the concerned machinery or equipment.
Maintenance Work Order is assigned a number according to the receiving in the Maintenance Reference Register .
Maintenance Manager assigns the maintenance work to the concerned personal
After the completion of work the section incharge signs the completion of Work Order.
All the record is filed and kept by the Maintenance Supervisor.

6.0 PRECAUTION:

6.1 Immediately stop the machine whenever feel any kind of abnormality during operation.
6.2 The machine should be handled by the trained operator.

No comments: