1. PURPOSE
It is established to provide a proper procedure of making Demin water in water treatment department.
2. SCOPE
It is applicable in the water treatment department.
3. RESPONSIBILITY
Maintenance officer (Mechanical / Electrical)
Maintenance Supervisor (Mechanical / Electrical)
4. PROCEDURE
The De-ionized water with instrument is handled in the following way.
5. MAINTENANCE
MONITORING OF MACHINE MAINTENANCE:
Time to time check each and every part of De-ionizer Plant according to the maintenance schedule.
Check the following parts carefully.
Resin condition
Resin Level
Electric Panel & Electronic Card
Pump
P.V.C Pipe, Elbow Union and leakage etc.
This activity is then documented in the form Machinery & Equipment Maintenance Log
Check the De-Ionizer Plant condition time to time to find any kind of problem during operation.
All the monitoring record is filed and kept by the Maintenance Supervisor.
EMERGENCY / BREAKDOWN MONITORING:
Maintenance Manager receives Maintenance Work Order duly signed by the section incharge of the concerned machinery or equipment.
Maintenance Work Order is assigned a number according to the receiving in the Maintenance Reference Register.
Maintenance Manager assigns the maintenance work to the concerned personal
After the completion of work the section incharge signs the completion of Work Order.
All the record is filed and kept by the Maintenance Supervisor.
PRECAUTION:
The trained operator should handle machine.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment