1. PURPOSE
It is established to provide a proper procedure to decreasing water temperature according to the requirement.
2. SCOPE
It is applicable in Infusion manufacturing department.
3. RESPONSIBILITY
Section Incharge
Operator
Maintenance officer (Mechanical / Electrical)
Maintenance Supervisor (Mechanical / Electrical)
4 PROCEDURE
The Cooling Tower with instrument is handled in the following way.
CLEANING:
Drain the dirt water and wash the cooling tower with normal water from inside and outside.
Dismental the wooden fences, and wash these fence with plain water.
Clean the fan blades, electric motors with normal cloth.
5 MAINTENANCE
MONITORING OF MACHINE MAINTENANCE:
Time to time check each and every part of Cooling Tower according to the maintenance schedule.
Check the following parts carefully.
Electric motor
Electric Starter
Water Tank
Fan Blade
Gate Valve
This activity is then documented in the form Machinery & Equipment Maintenance Log
Check the Cooling Tower condition time to time to find any kind of problem during operation.
All the monitoring record is filed and kept by the Maintenance Supervisor.
EMERGENCY / BREAKDOWN MONITORING:
Maintenance Manager receives Maintenance Work Order duly signed by the section incharge of the concerned machinery or equipment.
Maintenance Work Order is assigned a number according to the receiving in the Maintenance Reference Register.
Maintenance Manager assigns the maintenance work to the concerned personal
After the completion of work the section incharge signs the completion of Work Order.
All the record is filed and kept by the Maintenance Supervisor.
PRECAUTIONS:
Lubricate should be done regularly.
Immediately stop the process if find any kind of abnormality during operations.