1. PURPOSE
It is established to provide a procedure for proper and continuous forming of tablets.
2. SCOPE
This is applicable for proper forming of Tablets in the Dry product manufacturing area.
3. RESPONSIBILITY
Maintenance officer (Mechanical / Electrical)
Maintenance Supervisor (Mechanical / Electrical)
4. PROCEDURE
The Rotary Compression Machine ZP-25 with instrument is handled in the following way.
5. MAINTENANCE
MONITORING OF MACHINE MAINTENANCE:
Time to time check each and every part of Rotary machine according to the maintenance schedule.
Check the following parts carefully.
Electric motor
Electric Starter
Push Switches
Bushes and Pins
Bearings
Punches and Dies
V, Belts
Pulley
Gears
This activity is then documented in the form Machinery & Equipment Maintenance Log
Check the Rotary machine condition time to time to find any kind of problem during operation.
All the monitoring record is filed and kept by the Maintenance Supervisor.
EMERGENCY / BREAKDOWN MONITORING:
Maintenance Manager receives Maintenance Work Order duly signed by the section incharge of the concerned machinery or equipment.
Maintenance Work Order is assigned a number according to the receiving in the Maintenance Reference Register.
Maintenance Manager assigns the maintenance work to the concerned personal
After the completion of work the section incharge signs the completion of Work Order.
All the record is filed and kept by the Maintenance Supervisor.
PRECAUTIONS:
Immediately stop the machine whenever feel any kind of abnormality during operation.
Machine should handled by the trained operator.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment