HOMOGENIZER

1. PURPOSE

1.1 It is established to provide a proper procedure for the Homogenization of thick solution.

2. SCOPE

2.1 It is applicable in the Oral Liquid Manufacturing Department.

3. RESPONSIBILITY

3.1 Maintenance officer (Mechanical / Electrical)
3.2 Maintenance Supervisor (Mechanical / Electrical)

4. PROCEDURE

4.1.1 The Homogenizer with instrument is handled in the following way.

5. MAINTENANCE

MONITORING OF MACHINE MAINTENANCE:

Time to time check each and every part of Homogenizer according to the maintenance schedule
Check the following parts carefully.
 Electric Supply
 Electric Motor
 V. Belt
 Bearing
 Rotor and stator clearance
 Inlet and Outlet valve
This activity is then documented in the form Machinery & Equipment Maintenance Log

Check the Homogenizer condition time to time to find any kind of problem during operation.
All the monitoring record is filed and kept by the Maintenance Supervisor.

EMERGENCY / BREAKDOWN MONITORING:

Maintenance Manager receives Maintenance Work Order duly signed by the section incharge of the concerned machinery or equipment.
Maintenance Work Order is assigned a number according to the receiving in the Maintenance Reference Register.
Maintenance Manager assigns the maintenance work to the concerned personal
After the completion of work the section incharge signs the completion of Work Order.
All the record is filed and kept by the Maintenance Supervisor.

PRECAUTIONS:

Immediately stop the machine whenever feel any kind of abnormality during operation.
Stay at your machine to meet any kind of emergency.