AIR CURTAIN BLOWER

1.0 PURPOSE

It is established to provide a proper procedure to prevent the entry of insects etc, in to the area.

2.0 SCOPE

It is applicable for the Entry of Store and Production Departments.
3.0 RESPONSIBILITY

Maintenance officer (Mechanical / Electrical)
Maintenance Supervisor (Mechanical / Electrical)

4.0 PROCEDURE

The Air Curtain Blower is handled in the following way.

5.0 MAINTENANCE

5.1 MONITORING OF MACHINE MAINTENANCE:

Time to time check each and every part of Air Curtain Blower according to the maintenance schedule.
Check the following parts carefully.
vPower Electric Supply
vElectric Motor
vElectric Starter
vLimit Switch
vBlowers
vShaft & Bearing
This activity is then documented in the form Machinery & Equipment Maintenance Log .
Check the Air Curtain Blower condition time to time to find any kind of problem during operation.
All the monitoring record is filed and kept by the Maintenance Supervisor.
5.2 EMERGENCY / BREAKDOWN MONITORING:

Maintenance Manager receives Maintenance Work Order duly signed by the section incharge of the concerned machinery or equipment.
Maintenance Work Order is assigned a number according to the receiving in the Maintenance Reference Register .
Maintenance Manager assigns the maintenance work to the concerned personal
After the completion of work the section incharge signs the completion of Work Order.
All the record is filed and kept by the Maintenance Supervisor.

6.0 PRECAUTIONS:

Immediately stop the blower whenever feel any kind of abnormality during operation.