Tuesday, July 21, 2009

DOUBLE CONE BLENDER

1. PURPOSE

It is established to provide a proper procedure for blending/mixing of raw material in dry powder mixing department.

2. SCOPE

It is applicable in Dry Powder section.

3. RESPONSIBILITY

Maintenance officer (Mechanical/Electrical)
Maintenance Supervisor (Mechanical/ Electrical)

4. PROCEDURE

The Double Cone Blender with instrument is handled in the following way.

5. MAINTENANCE

MONITORING OF MACHINE MAINTENANCE:

Time to time check each and every part of Double Cone Blender according to the maintenance schedule.
Check the following parts carefully.
 Electric motor
 Electric Starter
 V , Belt
 Pullies
 Gear Box
 Oil Level
 Chain
 Alignment of blades
This activity is then documented in the form Machinery & Equipment Maintenance Log Check the Double Cone Blender condition time to time to find any kind of problem during operation.
All the monitoring record is filed and kept by the Maintenance Supervisor.
EMERGENCY / BREAKDOWN MONITORING:

Maintenance Manager receives Maintenance Work Order duly signed by the section incharge of the concerned machinery or equipment.
Maintenance Work Order is assigned a number according to the receiving in the Maintenance Reference Register.
Maintenance Manager assigns the maintenance work to the concerned personal
After the completion of work the section incharge signs the completion of Work Order.
All the record is filed and kept by the Maintenance Supervisor.
PRECAUTIONS:

Always use protective gloves when operating the machine.
If find any kind of noise, vibration etc. immediately switch the main power supply button to “OFF”.